As part of our CIF project we are replacing thermal insulation of the heat distribution system for the main school building and the separate kitchen/hall building
The main elements of the project for the kitchen/hall building includes the replacement of an old gas boiler with 2 ASHPs. Projected CO2 saving based on this change = 944.4kgCo2/annum