8 actions
July 2023 |
||
---|---|---|
Added loft or wall insulationThu 27th Jul 2023 |
||
OtherMon 24th Jul 2023 |
||
Turned off water chillers and hot drink boilers in the school holidaysMon 24th Jul 2023 |
||
Upgraded interior lights to LEDMon 24th Jul 2023 |
||
Installed lights with occupancy sensorsMon 24th Jul 2023 |
||
Switched off hot water in school holidaysMon 24th Jul 2023 |
||
Switched off heating in school holidaysMon 24th Jul 2023 |
||
Checked windows are closed at the end of the dayMon 3rd Jul 2023 |
||
1 action
June 2023 |
||
Switched off lights and IT equipment after schoolMon 5th Jun 2023 |
||
1 action
August 2020 |
||
Replaced school boilerThu 20th Aug 2020 |